PHINMA PLAZA

- The 3CC System was incorporated into the basement retaining wall (5 level), mat foundation, cistern tank and sump pit waterproofing. The EDC System was incorporated into the ground floor beams and slab waterproofing.

PETRON OM & S BLDG.

The Ultrodeck BT was incorporated into the roofdeck.

ASSUMPTION COLLEGE

The Bitaflex was applied into comport room and roofdeck

UST Sports Complex

The 3CC System is incorporated into the cistern tank.

Chodvale Dev't Corp.

The Tampur 150 injection was used in the repair

ABS- CBN BLDG.

- The 3CC System was incorporated into the base slab and walls of the Waste Water Treatment Plant waterproofing.

MONASTERY

- The EDC System is incorporated into the roof deck.

PETRON REFINERY

- The 3CC System is incorporated to the rehabilitation of the pier for salt- water corrosion protection.

TRAG-2

- The 3CC System is incorporated into the swimming pool.

ESB - East Super Block

The Mariseal 250 was incorporated into the roofdecks.

FERNANDINA 88

- The EDC System was incorporated into the suspended swimming pool waterproofing.

ANACONDA WAREHOUSE

The Rokite (clear) floor sealer and Diamite was applied into the hallway and loading area.

Market Market

The Cementop EFC was incorporated into the Beams/honeycomb, Basement, Substation Room, Genset Room, Pump Room/Fuel Tank room & AHU/EE Room

ILLUMINA RESIDENCE

The Uni Dri Super 20 was incorporated into the Cistern Tank

R. GUTIANON RES.

- The 3CC systems was incorporated at the Cistern Tank

LIMA SERVICE APT.

The Diamite floor hardener/ dustproofer & Rokite floor sealer (blue) was applied on the ACCU room, electrical rooms, boiler and pump room, transformer room, generator room, workshop, and PABXCATV storage.

HIZON LABORATORY

- The 3CC System is incorporated into the roofdeck.

UC-LM DORM & SCH. BLDG.

The Aquapel System is incorporated into the wall and slab.