- The EDC System is incorporated into the roof deck area.
The 3CC System is incorporated into the swimming pool
The 3CC System was incorporated into the 2 level basement retaining wall.
- The 3CC System was incorporated into the 2nd level parking area waterproofing.
- The 3CC System is incorporated into the inground swimming pool.
- The 3CC System was incorporated into the domestic water tank top slab that is also the parking area runway to eliminate the need for protective topping.
The Integral waterproofing System is incorporated into roofdeck and machine room.
- The 3CC System is incorporated into the rehabilitation of the existing fender system.
- The 3CC System will be used in the STP waterproofing.
The 3CC System is incorporated into the podium.
The 3CC System is incorporated into the cistern tank.
- The 3CC System is incorporated into the on-ground swimming pool.
The 3CC System was incorporated into the basement retaining wall (3 level) waterproofing.
- The 3CC System was incorporated into the base slab and walls waterproofing.
- The 3CC System is incorporated into the in ground swimming pool.
- The 3CC System was incorporated into the basement retaining wall (7 level), ramps, and cistern tank waterproofing.
The Integral Waterproofing System is incorporated into pressure and retaining wall.
- The 3CC was incorporated at the Cistern Tank & Elevator Pit