- The 3CC System was incorporated into the basement- retaining wall (5 level), raft foundation, cistern tank and sump pit waterproofing. The EDC System was incorporated into the podium deck and roof deck waterproofing.

Location: 
Rockwell Center, J.P.Rizal Makati
Contractor: 
CE Const.
Total Area: 
4,722m3(3CC)397m3(EDC)
Completion Date: 
1998-10
Catalog: 
Integral Waterproofing
Island Group: 
Luzon