Sanyo Denki

The Stopox WL-100 was incorporated into the warehouse.

MAYFIELD

- The 3CC Systems was incorporated at the swimming pool

PHIL. FOREMOST MILLING CORPORATION

- The 3CC System was incorporated into the working apron (trench canal) waterproofing

ADD CONVENTION CENTRE

- The 3CC System is incorporated into the water tank.

ICON TOWER

- The 3CC System is incorporated into retaining wall & cistern tank.

CEBU HILTON HOTEL

The Shasta E-4120 & Shasta E-4170 Torch Applied Waterproofing Membrane was applied at the G/F, Parking Area, C.R. & Roofdeck.

PETRON MEGA PLAZA

The driveway (5, 000m2) was treated with Diamite floor hardener/ dustproofer.

ABENSON'S ALABANG

The Gripset RD was applied into the roofdeck.

MIRANT POWER PLAN

- The 3CC System is incorporated to the rehabilitation of the pier for salt- water corrosion protection.

TRIBECCA CONDO. 1 & 2

The 3CC System and Aquapel System is incorporated into the slab & shear wall.

HILTON CEBU RESORTS & TOWERS

The Mariseal 260 Waterproofing Membrane was applied at the Roofdeck, Parapet Walls and Secondary Roof.

FERNANDEZ RES.

- The 3CC Systems was incorporated at firewall

ONE ROCKWELL

- The 3CC System is incorporated into the substructure and to the swimming pool.

AYALA CENTER CEBU

The 3CC System is incorporated into the rehabilitation of the cistern tank.

Venice Corporate Center

The Integral Waterproofing System is incorporated into vehicular ramp, parking, driveway, and roof deck.

THE ENTERPRISE CENTER

- The 3CC System was incorporated into the basement retaining wall (7 level), ramps, and cistern tank waterproofing.

WOODLAND HILLS SUBD.

The 3CC System is incorporated into the inground swimming pool.

TEFASCO BANANA WAREHOUSE

The EDC System was incorporated into all in- ground concrete structures (e.g. footing and tie beams) of the banana warehouse as a protection against the highly corrosive salt water in the ground water table.