The EDC System was incorporated into all in- ground concrete structures (e.g. footing and tie beams) of the banana warehouse as a protection against the highly corrosive salt water in the ground water table.

Location: 
Lanang, Davao
Contractor: 
Konstrak Int'l Inc.
Total Area: 
84.5m3
Completion Date: 
1995-03
Catalog: 
Integral Waterproofing
Island Group: 
Mindanao