FORTUNE STAR CONDO

The Power mix was applied into the roofdeck area, elevetor pit, Toilets & Baths

ABENSON'S ALABANG

The Gripset RD was applied into the roofdeck.

CEBU HILTON HOTEL RESORT

The Shasta E-4120 & Shasta E-4170 Torch Applied Waterproofing Membrane was applied at the Driveway, Landscape & Tennis Court, Ground Floor, Toilet & Basement, and all toilet.

PANCAKE HOUSE CENTER

The Mariseal 250 was incorporated into the parapet wall and ledges.

INTEL CV-1 FACILITY PROJ.

The manufacturing building- ground floor machine rooms, storage rooms, CW area substations, direct and indirect materials area, UPS rooms, utility building, administration building, machine room & equipment pads with a total area of 11, 050m2 were treated with Diamite floor hardener/ dustproofer & Rokite (gray) floor sealer.

Ateneo De Manila

The Mariseal 250 was incorporated into the concrete gutter, canopy, bridgeway deck. The StoCrete CCW-Elastic was incorporated into the M & F toilets.

MARKET! MARKET1

The Diamite was applied at the basement, parking area, hallway

WALTERMART-DASMA

The Gripset 51 was applied into the roof deck area.

PETRON BATAAN REFINERY

The Mariseal 260 was incorporated into the roofdeck.

CHITTICK WAREHOUSE

The warehouse (400m2) was treated with Diamite floor hardener/ dustproofer & Rokite (clear) floor sealer.

Tivoli Garden

The Bitaflex was incorporated into the Sky Garden Deck -Slab.

SY RESIDENCE

The Polyurethane Base Waterproofing System was applied at the terraces slab. The Bitaflex Waterproofing System was applied at the toilet & baths.

EXCHANGE COR. BLDG.

The Gripset 51 was applied into the roof deck area.

TIMEX PHILIPPINES

The Polyurethane Waterproofing Membrane was applied at the Roofdeck.

G & F PARTNER BUILDING

The Mariseal 250 was incorporated into the floor ledges A-1, A-2, & Canopy Deck @ 2nd Floor.

ROCKWELL CENTER

The Epoxy tank lining (white) was applied on the sewage treatment plant.

BUKIDNON RESOURCES

The aseptic area, control room, engineering office and laboratory covering an area of 850m2 was treated with Diamite floor hardener/ dustproofer & Rokite (gray) floor sealer, an additional area of 2, 960m2 covering the boiler, generator rooms, storage rooms, research and development bldg. and administration bldg., and canteen were treated with Diamite & Rokite (green). The control room was protected by Epoxy (gray) coating.

THE COLUMN

The Diamite was applied at the parking area.

FIVE STOREY BLDG.

The Tamseal 20 was applied into the concrete gutter.