YOKOHAMA TIRE PHILIPPINES

The Aquapel System is incorporated into the concrete gutter.

OCEAN STAR

- The 3CC System is incorporated into the retaining wall.

AYALA LIFE CEBU

The 3CC System was incorporated into the basement retaining wall (3 level) waterproofing.

UST Sports Complex

The Boscoseal PU was incorporated into the ACCU Ledge, Linen Room, Toilets, Pantry, Utility Room.
The Cementseal TLE was incorporated into the cistern tanks.

FERREIRA MANSION

- The EDC System was incorporated into the basement wall (1 level), balconies, and roof slab waterproofing.

M.A BAUTISTA BUILDING

- The EDC System is incorporated into the suspended swimming pool slab and wall waterproofing.

MAKRO CUBAO

- The 3CC System is incorporated into the cistern tank.

PETRON SUB Z

The Mariseal 250 was incorporated into the concrete walls.

FUENTE TOWER 1 / TOWER 2

The Bitaflex Membrane was applied at the bath tub, C.R., deck, basement, ledge, chiller & blower, kitchen and Tank Room.

RENAISSANCE 5000

- The 3CC System was incorporated into the basement retaining wall waterproofing.

WYETH PHILS.

The 3CC System is incorporated into the podium.

J. MANABAT APARTMENTS (MAMBALING)

The Bitadur & Bitaflex waterproofing system was applied at the Roofdeck, C.R., Walls ways and Ledges.

CHITTICK WAREHOUSE

The warehouse (400m2) was treated with Diamite floor hardener/ dustproofer & Rokite (clear) floor sealer.

WALTERMART-STA ROSA

The Gripset 51 was applied into the roof deck area.

THE COLUMNS

- The Everdure Caltite System is incorporated into the slab, beam and parapet wall @ guard house.

BUKIDNON RESOURCES

The aseptic area, control room, engineering office and laboratory covering an area of 850m2 was treated with Diamite floor hardener/ dustproofer & Rokite (gray) floor sealer, an additional area of 2, 960m2 covering the boiler, generator rooms, storage rooms, research and development bldg. and administration bldg., and canteen were treated with Diamite & Rokite (green). The control room was protected by Epoxy (gray) coating.

Mayor Caesar Dy Residence

The Mariseal 270 & 250 was incorporated into the concrete gutter.
The Sto Jumbosil was incorporated into the Tegula Roof.

MAHOGANY PLACE

- The 3CC System is incorporated into the swimming pool

BANGKO SENTRAL NG PILIPINAS

- The 3CC System was incorporated into the potable water tank waterproofing.

BAUAN PIER REHAB

- The 3CC System is incorporated to the rehabilitation of the pier.