ILOILO COMM'L. WHSE

The EDC System was incorporated into the roof deck waterproofing.

SY RESIDENCE

- The 3CC System was incorporated into the basement retaining (level 1).

ONE ROCKWELL

- The 3CC System is incorporated into the substructure and to the swimming pool.

MIRANT POWER PLAN

- The 3CC System is incorporated to the rehabilitation of the pier for salt- water corrosion protection.

I Hub 9&10

The Hycrete W1000 is incorporated into Cistern tank and STP.

MAYFIELD

- The 3CC Systems was incorporated at the swimming pool

ATENEO DORMITORY

- The 3CC System and Aquapel System is incorporated into the Water Tank.

TEFASCO BANANA WAREHOUSE

The EDC System was incorporated into all in- ground concrete structures (e.g. footing and tie beams) of the banana warehouse as a protection against the highly corrosive salt water in the ground water table.

BELLA VILLA

- The EDC and 3CC System was incorporated into the basement retaining wall (1 level) and cistern tank waterproofing.

ICEC TOWER

- The 3CC System was incorporated into the basement retaining wall (3 level) waterproofing.The EDC System was incorporated into the ground floor slab waterproofing

YOKOHAMA TIRE PHILIPPINES

The Aquapel System is incorporated into the concrete gutter.

Buddha Bar

The 3CC System is incorporated into the retaining wall, slab, sump pit, basement.

STANDARD FACTORY BLDG

The 3CC System was incorporated into the cistern tank, elevated water tank, roof gutter, stair roof, and front roof waterproofing. The EDC System was incorporated into the toilet, mezzanine- exposed deck, roof deck, machine room deck waterproofing.

POWER PLANT MALL

- The 3CC System was incorporated into the lowest basement retaining wall (level 3) waterproofing.

MERCEDES BLDG.

- The 3CC System is incorporated into the retaining wall.

Ascott (The Residences)

The Integral Waterproofing System is incorporated into cistern tank.

MAKRO- LAS PINAS

- The 3CC System is incorporated into the cistern tank/ suspended slab.

BRITISH SCHOOL

- The 3CC System was incorporated into the cistern tank will be used in the portions of the podium deck. The EDC System will be used in the portions of podium deck and the whole roof deck. The 3CC Aquapel will be used on the slab on grade for damproofing.

WYETH PHILS.

The 3CC System is incorporated into the wall and slab.