• The 3CC System was incorporated into the cistern tank, elevated water tank, roof gutter, stair roof, and front roof waterproofing.
• The EDC System was incorporated into the toilet, mezzanine- exposed deck, roof deck, machine room deck waterproofing.
Location:
Cebu Business Park
Contractor:
Makati Dev’t Corp
Owner:
Cebu Holdings, Inc.
Total Area:
4,894m3(3CC) / 918.95m3(EDC)
Completion Date:
2001-03
Catalog:
Integral Waterproofing
Island Group:
Visayas