The 3CC System was incorporated into the cistern tank, elevated water tank, roof gutter, stair roof, and front roof waterproofing. The EDC System was incorporated into the toilet, mezzanine- exposed deck, roof deck, machine room deck waterproofing.
The Shasta E-4120 & Shasta E-4170 Torch Applied Waterproofing Membrane was applied at the Driveway, Landscape & Tennis Court, Ground Floor, Toilet & Basement, and all toilet.
The Mariseal 250 was incorporated into the roofdeck, GI Roof, floor slab. The Cementseal TLE was incorporated into the cistern tanks. The Sto Jumbosil was incorporated into the facade wall.