RAYA GARDEN CONDO

- The 3CC System is incorporated into the in ground swimming pool.

WASTEWATER TREATMENT ERATION TANK

The 3CC System was incorporated into the slab and wall aeration tank waterproofing.

Clinica Antipolo Hospital

The 3CC System is incorporated into the retaining wall and slab.

TECHNOFREEZE COLD STORAGE EXPANSION

The Diamite floor hardener / dustproofer and Rokite (clear) floor sealer was applied into the loading area, processing room, blast freezer room and ante room.

CHATEU VALENZUELA

The Bitacem 120 was applied into Toilets & Bath

Park Square 1

The cementseal Epoxy was incorporated into the Floorslab

CYPRESS TOWERS

- The 3CC System is incorporated into the swimming pool, parking area & roofdeck.

CITY SPORTS CLUB- CEBU

• The 3CC System was incorporated into the cistern tank, elevated water tank, roof gutter, stair roof, and front roof waterproofing.
• The EDC System was incorporated into the toilet, mezzanine- exposed deck, roof deck, machine room deck waterproofing.

Marriot Grand Ballroom

The Integral Waterproofing System is incorporated into pressure and retaining wall.

JAKA TOWER

- The 3CC System was incorporated into the basement retaining wall (7 level) & cistern tank waterproofing.

ROBINSON'S PLACE-Fairview

The Rokite (blue- gray) floor sealer was applied into the chiller electrical room, genset room, pump room & 3rd floor partial hallway of approximately 1200m2.

FORTUNE STAR CONDO

The Power mix was applied into the roofdeck area, elevetor pit, Toilets & Baths

EAST RAYA GARDEN

The Bitaflex was incorporated into the Bldg F & C at STP, T&B, Roofdeck and Elevator Pit.

Don Manuel Suites

The Hycrete W400 is incorporated into cistern tank and fire tank.

SY RESIDENCE

- The 3CC System was incorporated into the basement retaining (level 1).