- The EDC System was incorporated into the water tank wall, ground floor slab, suspended water tank, podium deck, roof deck and the swimming pool waterproofing. The 3CC System was incorporated into the sewage treatment plant waterproofing.
The EDC System is incorporated into the 2nd floor podium deck, roof deck and machine room deck waterproofing. The 3CC System is incorporated into the driveway parking and ledges (2nd to 7th level) waterproofing.