- The EDC System was incorporated into the water tank wall, ground floor slab, suspended water tank, podium deck, roof deck and the swimming pool waterproofing. The 3CC System was incorporated into the sewage treatment plant waterproofing.
Location:
J.P. Rizal, Makati City
Contractor:
DMCI
Total Area:
3,921.4m3
Completion Date:
1999-07
Catalog:
Integral Waterproofing
Island Group:
Luzon