FERREIRA MANSION

Application of liquid membrane to roof deck.

MARKET! MARKET1

The Diamite was applied at the basement, parking area, hallway

OCEAN STAR

- The 3CC System is incorporated into the retaining wall.

SM MOA

- The 3CC was incorporated at the beam and slab

POWER PLANT MALL

- The 3CC System was incorporated into the lowest basement retaining wall (level 3) waterproofing.

PETRON REFINERY

- The 3CC System is incorporated to the rehabilitation of the pier for salt- water corrosion protection.

T.B.C. SOUTH/PODIUM

- The 3CC System is incorporated into the watertank.

PRINCEVILLE CONDO

The Gripset 38 was applied into the cistern tank.

FEU East Asia

The Integral Waterproofing System is incorporated into Slab, flashing tanks, flooring and retaining wall.

PIONEER HIGHLANDS

- The Aquapel 3CC was incorporated into the basement retaining wall (6 level) & ramps waterproofing.

PETRON SUBSTATION V

The Ultrodeck BT was incorporated into the roofdeck.

ASSUMPTION COLLEGE

The EDC System is incorporated into the roofdeck

Tivoli Garden

The 3CC System is incorporated into the swimming pool.

MLA. JAPANESE SCHOOL

- The 3CC System was incorporated into the on- ground swimming pool waterproofing.

MONASTERY

- The EDC System is incorporated into the roof deck.

WYETH PHILS.

The 3CC System is incorporated into the wall and slab.

TIMEX PHILIPPINES

The Polyurethane Waterproofing Membrane was applied at the Roofdeck.

NESTLE BLDG.

- The 3CC System was incorporated into the basement- retaining wall (5 level), raft foundation, cistern tank and sump pit waterproofing. The EDC System was incorporated into the podium deck and roof deck waterproofing.

Columbian Gardens

The Cementseal 1 was applied into the slab