The EDC System is incorporated into the 2nd floor podium deck, roof deck and machine room deck waterproofing. The 3CC System is incorporated into the driveway parking and ledges (2nd to 7th level) waterproofing.
Location:
Gorordo Avenue, Cebu City
Contractor:
Solid Triangle Bldrs Inc.
Total Area:
204m3 (edc)/291.5m3(3CC)
Completion Date:
2002-06
Catalog:
Integral Waterproofing
Island Group:
Visayas