The EDC System was incorporated into the sugar room area to prevent sugar acid from penetrating.
Location:
Polomolok, South Cotabato
Contractor:
DOLE
Total Area:
100m3
Completion Date:
1998-03
Catalog:
Integral Waterproofing
Island Group:
Visayas