The aseptic area, control room, engineering office and laboratory covering an area of 850m2 was treated with Diamite floor hardener/ dustproofer & Rokite (gray) floor sealer, an additional area of 2, 960m2 covering the boiler, generator rooms, storage rooms, research and development bldg. and administration bldg., and canteen were treated with Diamite & Rokite (green). The control room was protected by Epoxy (gray) coating.

Location: 
Bukidnon, Mindanao
Contractor: 
BRCI
Total Area: 
3,046m3
Completion Date: 
1995-05
Catalog: 
Surface Protection
Island Group: 
Mindanao