The EDC System is incorporated into the pressure slab, sump pit, oil separator tank, elevator pit, oil separator beam wall. The Aquapel System is incorporated into the pressure slab, shear wall, lean concrete, pile cap, & elevator pit.
The Diamite was incorporated into the New Building, Underground Walkway. The Mariseal 250 was incorporated into the roof concrete gutter. The Stocrete 4222 was incorporated into the elevator pit. The Mariseal 270 was incorporated into the toilets & upstand wall.