HERITAGE MEMORIAL PARK

The Rokite was applied into the flooring area.

VISTA DE LAGO

The 3CC System is incorporated into the Roofdeck Slab Parking Bldg.

CASERA BUILDING

The 3CC System was incorporated into the ground floor parking area and suspended slab waterproofing.

Manila Bay Resort

The Hycrete W1000 is incorporated into pressure slab and STP.

INTEL CV-1 FACILITY PROJ.

The manufacturing building- ground floor machine rooms, storage rooms, CW area substations, direct and indirect materials area, UPS rooms, utility building, administration building, machine room & equipment pads with a total area of 11, 050m2 were treated with Diamite floor hardener/ dustproofer & Rokite (gray) floor sealer.

SM GROUP COR. OFFICE

- The EDC System was incorporated into the concrete sections of the roof deck.

CAYLABNE RESORT STP

- The 3CC System will be used in the STP waterproofing.

PICC Hall

The Epoxy Grout was applied at the Pavement joints.

ATENEO DORMITORY

- The 3CC System and Aquapel System is incorporated into the Water Tank.

ACRO CITY

- The 3CC System was incorporated into the basement retaining wall.

FPIP Road

The cementseal EB was incorporated into Crack/Floor Slab

PETRON SUB M,N, & Q

The Ultrodeck BT was incorporated into the roofdeck.

PROFOODS INT'L - DAVAO

The 3CC System was incorporated at slab on grade (proc. Area)

Accolade Place

The 3CC System is incorporated into the swimming pool.

CHUA BUILDING

- The 3CC System is incorporated into the basement retaining wall waterproofing.

OCEAN STAR

- The 3CC System is incorporated into the retaining wall.

SM MOA

- The 3CC was incorporated at the beam and slab

POWER PLANT MALL

- The 3CC System was incorporated into the lowest basement retaining wall (level 3) waterproofing.

PETRON REFINERY

- The 3CC System is incorporated to the rehabilitation of the pier for salt- water corrosion protection.