The 3CC System is incorporated into the swimming pool
- The 3CC System is incorporated into the rehabilitation of the existing fender system.
- The 3CC System was incorporated into the suspended swimming pool
- The 3CC System is incorporated into the retaining wall.
The cementseal 1 Epoxy Pressure Injection was incorporated into the concrete topping.
The Cementseal UW was applied into the slab.
The Integral Waterproofing System is incorporated into cistern tank.
- The EDC System was incorporated into the garden deck and roof deck waterproofing.
The 3CC System is incorporated into the swimming pool.
- The 3CC System was incorporated into the basement retaining wall (one level) and slab on fill waterproofing.
- The Aquapel systems was incorporated at the Roofdeck
- The 3CC System is incorporated into the Swimming Pool.
The Ronabound PU injection was applied at the Ballroom slab
- The EDC System was incorporated into the basement retaining wall (3 level), cistern tank, sump pit & suspended water tank waterproofing.
The 3CC System is incorporated into the on-ground swimming pool.
The Davco K10 was incorporated into the roofdeck slab, gutter and dome.
The 3CC System is incorporated into the new cold storage and pier facility project.
- The EDC System is incorporated into the roof deck area.
The Bitadur was applied at the slab & wall.