LPG PIER FEINDER

The Cementseal 1 is incorporated to the pier deck.

STANDARD FACTORY BLDG

The 3CC System was incorporated into the cistern tank, elevated water tank, roof gutter, stair roof, and front roof waterproofing. The EDC System was incorporated into the toilet, mezzanine- exposed deck, roof deck, machine room deck waterproofing.

One Shangri-la

The Integral Waterproofing System is incorporated into Suspended slab and swimming pool.

LORENZO RESIDENCE

- The EDC System was incorporated into the basement wall, basement slab, and roof deck slab waterproofing.

GLOBE TELECOM BLDG.

- The 3CC System is incorporated into the top 300mm of mat foundation at gridline 1, retaining wall and shear wall waterproofing.

PETER PAUL PHILS. CORP.

- The EDC was incorporated into the replacement of factory floor slab

8101 PEARL PLAZA BUILDING

The Diamite & Rokite was applied into the gutter areas.

PETRON SUBSTATION V

The Mariseal 250 was incorporated into the roofdeck.

CEBU HILTON HOTEL RESORT

The Shasta E-4120 & Shasta E-4170 Torch Applied Waterproofing Membrane was applied at the Driveway, Landscape & Tennis Court, Ground Floor, Toilet & Basement, and all toilet.

NEW BRENT SCHOOL

- The 3CC System was incorporated into the cistern tank.

Market! Market!

The Cementseal 1 injection was incorporated into beams/honeycomb

ROSEWOOD POINTE

- The 3CC System is incorporated into the in ground swimming pool.

PRIMEX DAVAO

The EDC System is incorporated into the of the floor slab for acid protection.

Buddha Bar

The 3CC System is incorporated into the retaining wall, slab, sump pit, basement.

DIONESIO RES.

- The 3CC Systems was incorporated at the Cistern Tank

ROXAS TRIANGLE

- The 3CC System was incorporated into the podium deck waterproofing.