MAKRO CUBAO

- The 3CC System is incorporated into the cistern tank.

PETRON SUB Z

The Mariseal 250 was incorporated into the concrete walls.

FUENTE TOWER 1 / TOWER 2

The Bitaflex Membrane was applied at the bath tub, C.R., deck, basement, ledge, chiller & blower, kitchen and Tank Room.

RENAISSANCE 5000

- The 3CC System was incorporated into the basement retaining wall waterproofing.

YOKOHAMA TIRE PHILIPPINES

The Aquapel System is incorporated into the concrete gutter.

OCEAN STAR

- The 3CC System is incorporated into the retaining wall.

WALTERMART-STA ROSA

The Gripset 51 was applied into the roof deck area.

THE COLUMNS

- The Everdure Caltite System is incorporated into the slab, beam and parapet wall @ guard house.

BUKIDNON RESOURCES

The aseptic area, control room, engineering office and laboratory covering an area of 850m2 was treated with Diamite floor hardener/ dustproofer & Rokite (gray) floor sealer, an additional area of 2, 960m2 covering the boiler, generator rooms, storage rooms, research and development bldg. and administration bldg., and canteen were treated with Diamite & Rokite (green). The control room was protected by Epoxy (gray) coating.

Mayor Caesar Dy Residence

The Mariseal 270 & 250 was incorporated into the concrete gutter.
The Sto Jumbosil was incorporated into the Tegula Roof.

MAHOGANY PLACE

- The 3CC System is incorporated into the swimming pool

BANGKO SENTRAL NG PILIPINAS

- The 3CC System was incorporated into the potable water tank waterproofing.

BAUAN PIER REHAB

- The 3CC System is incorporated to the rehabilitation of the pier.

WYETH PHILS.

The 3CC System is incorporated into the podium.

J. MANABAT APARTMENTS (MAMBALING)

The Bitadur & Bitaflex waterproofing system was applied at the Roofdeck, C.R., Walls ways and Ledges.

CHITTICK WAREHOUSE

The warehouse (400m2) was treated with Diamite floor hardener/ dustproofer & Rokite (clear) floor sealer.

Solaire Manila - Hotel & Casino

The EDC System is incorporated into the pressure slab, sump pit, oil separator tank, elevator pit, oil separator beam wall.
The Aquapel System is incorporated into the pressure slab, shear wall, lean concrete, pile cap, & elevator pit.

SISON'S RESIDENCE

- The 3CC System was incorporated into the basement wall waterproofing.

BONIFACIO RIDGE

- The 3CC System was incorporated into the cistern tank waterproofing.

THE COLUMN

- The EDC System is incorporated in suspended 7th Floor pool.