SY RESIDENCE

The Polyurethane Base Waterproofing System was applied at the terraces slab. The Bitaflex Waterproofing System was applied at the toilet & baths.

TIMEX PHILIPPINES

The Polyurethane Waterproofing Membrane was applied at the Roofdeck.

G & F PARTNER BUILDING

The Mariseal 250 was incorporated into the floor ledges A-1, A-2, & Canopy Deck @ 2nd Floor.

EXCHANGE COR. BLDG.

The Gripset 51 was applied into the roof deck area.

ROCKWELL CENTER

The Epoxy tank lining (white) was applied on the sewage treatment plant.

BUKIDNON RESOURCES

The aseptic area, control room, engineering office and laboratory covering an area of 850m2 was treated with Diamite floor hardener/ dustproofer & Rokite (gray) floor sealer, an additional area of 2, 960m2 covering the boiler, generator rooms, storage rooms, research and development bldg. and administration bldg., and canteen were treated with Diamite & Rokite (green). The control room was protected by Epoxy (gray) coating.

THE COLUMN

The Diamite was applied at the parking area.

IMPERIAL PALACE WATER PARK, RESORTS & SPA

The Bitaflex Membrane was applied at the Bldg. D,E, & F, Pool Villas, Slide Pool Tower, Waterpark bridge.

PETRON SUB Z

The Mariseal 250 was incorporated into the concrete walls.

FIVE STOREY BLDG.

The Tamseal 20 was applied into the concrete gutter.

UNIFRUTTI WHARF

The Diamite was applied at the floor slab for New Cold Storage.

PETRON OM & S BLDG.

The Ultrodeck BT was incorporated into the roofdeck.

CITIBANK CARD CENTER

The Diamite floor hardener and dustproofer was applied into the equipment pads, machine room, ramps, & car parking areas of approximately 1.3 hectares.

FUENTE TOWER 1 / TOWER 2

The Bitaflex Membrane was applied at the bath tub, C.R., deck, basement, ledge, chiller & blower, kitchen and Tank Room.

Ohana Place

The Bitaflex was incorporated into the roofdeck, plant box, T&B.

PSK BUILDING

The Diamite & Rokite was applied into the 2nd production area.