CITY SPORTS CLUB- CEBU

• The 3CC System was incorporated into the cistern tank, elevated water tank, roof gutter, stair roof, and front roof waterproofing.
• The EDC System was incorporated into the toilet, mezzanine- exposed deck, roof deck, machine room deck waterproofing.

SICCION MKTG. BLDG.

- The 3CC System was incorporated into the basement slab, water tank & elevator pit waterproofing.

ROYAL PALM VILLAGE

- The Everdure Caltite System is incorporated into the Suspended Swimming Pool.

ROXAS TRIANGLE

- The 3CC System was incorporated into the suspended water tank and roof deck waterproofing.

PETER PAUL PHILS. CORP.

- The EDC was incorporated into the replacement of factory floor slab

LORENZO RES.

- The 3CC Systems was incorporated at the swimming pool

MAHOGANY PHASE 3

- The 3CC System is incorporated into the Swimming Pool.

WASTEWATER TREATMENT ERATION TANK

The 3CC System was incorporated into the slab and wall aeration tank waterproofing.

PIONEER HIGHLANDS

- The Aquapel 3CC was incorporated into the basement retaining wall (6 level) & ramps waterproofing.

PETRON REFINERY

- The 3CC System is incorporated to the rehabilitation of the pier for salt- water corrosion protection.

Stratford Residences

The 3CC System is incorporated into the retaining wall, water tank, & STP wall.

PERPETUAL SUCCOUR HOSPITAL

The EDC System is incorporated into the 2nd floor podium deck, roof deck and machine room deck waterproofing. The 3CC System is incorporated into the driveway parking and ledges (2nd to 7th level) waterproofing.

PHIL. FOREMOST MILLING CORPORATION

- The 3CC System was incorporated into the working apron (trench canal) waterproofing

VISTA DE LAGO

The 3CC System is incorporated into the Roofdeck Slab Parking Bldg.