- The 3CC System was incorporated into the basement- retaining wall (5 level), raft foundation, cistern tank and sump pit waterproofing. The EDC System was incorporated into the podium deck and roof deck waterproofing.
The EDC System is incorporated into the 2nd floor podium deck, roof deck and machine room deck waterproofing. The 3CC System is incorporated into the driveway parking and ledges (2nd to 7th level) waterproofing.